Provincial Mobile Shangjie Phase I Server Room


In September 2012, the provincial mobile operator temporarily added one 2000KW Weixin diesel generator set to the Phase I equipment room in Shangjie. Since the Phase II building for the Shangjie mobile operator's equipment room has not yet been constructed, this generator set was installed inside a temporary modular structure.